{short description of image}
{short description of image} Home {short description of image} Site Map {short description of image} Contact us
Materials Handling
{short description of image}
Doors
{short description of image}
Docking Systems
{short description of image}
Architectural Hardware
{short description of image}
Electronic Locks
{short description of image}
Wood Coatings
{short description of image} {short description of image}
{short description of image}
{short description of image}
{short description of image} Stationary Dock Levellers
{short description of image}
{short description of image} Drawbridge Dock Levellers
{short description of image}
{short description of image} Mobile Combidock
{short description of image}
{short description of image} Mobile Loading Ramps
{short description of image}
{short description of image} Dock Shelters
{short description of image}
Mobile Loading Ramps
The independent docking system

Thermal separation of the building from the docking system. Simple and fast installation in front of the building. Higher storage capacity in the building.


Variable product combinations give maximum flexibility!
The loadhouse offers almost unlimited possibilities:
  • Dock leveller with telescopic or swing lip.
  • Mechanical or inflatable dock shelters,
  • Cladding house in insulated or noninsulated panels or even the same cladding as on the building to which it is attached.
Everything can be tailor-made to the individual loading situation.

Limited ground area outside the door opening?
Due to its flexible design, the loadhouse can be supplied in straight or angled versions, depending on the ground size outside the loading bay area.
{short description of image}
Installation in front of building


Space and energy saving design!
As well as better building utilization, using the loadhouse offers energy savings. The premises can be heated or cooled without any air inlet from the outside. In addition to the outer wall door, the loadhouse can house a front door, creating a closed loading compartment.

Factory assembly means lower site installation costs!
Planning and delivery times are considerably reduced due to the high degree of pre-assembly of the loadhouse. This also makes installation time on site very short – it can even be installed during normal, running loading operations! Standard steel frame surface treatment is hot dip galvanizing.
{short description of image}
Normal or angled multiple system


Building economy
As an alternative to building extension investments, load houses offer an interesting cost saving possibility.

Useful options
  • Crawford eye to facilitate the dock-in procedure - Noise Reduction and Slip Protection coating
  • Hot dip galvanized coating
  • Floating buffers

Technical information
Nominal length 2010, 2450, 3010, 3510 mm
Nominal width 3300, 3500, 3600 mm
Overall height 4850 to 6050 mm
Load capacity 60 kN dynamic load
90 kN static load
Functional performance in accordance with the European Standard EN 1398.
{short description of image}
Located outside the warehouse
Different profiled panels
Individual components

{short description of image}